Real-Time Density and Thickness Estimation of Thin

2019-7-15  Achieving desired density is crucial for thin asphalt concrete (AC) overlay construction quality control and quality assurance purposes. Ground penetrating radar (GPR) can be implemented for AC pavement layer thickness and density prediction during compaction. However, the overlapping of GPR reflections from surface and bottom of the thin AC overlay, as well as the presence of surface moisture ...

Get Price

Real-Time Density and Thickness Estimation of Thin

Real-Time Density and Thickness Estimation of Thin Asphalt Pavement Overlay During Compaction Using Ground Penetrating Radar Data Siqi Wang, Shan

Get Price

Algorithm development for real-time thin asphalt concrete ...

2019-6-1  Ground-penetrating radar (GPR) is an effective, feasible, and non-destructive tool for real-time estimation of the density of asphalt concrete (AC) during compaction. When the AC pavement is thin, however, it is difficult to estimate the density due to the limited GPR signal resolution.

Get Price

Prediction of thin asphalt concrete overlay thickness and ...

When nonlinear gradient descent was applied to field test measured signals, the average AC overlay thickness prediction and AC density estimation errors were 3 mm and 1.81%, respectively. This study demonstrates that the nonlinear gradient descent is an effective approach for estimating thin AC overlay thickness and density from GPR data.

Get Price

Factors Impacting Monitoring Asphalt Pavement Density

2020-10-1  Real-time density and thickness estimation of thin asphalt pavement overlay during compaction using ground penetrating radar data Surv Geophys ( 2019 ) , pp. 1 - 15 2019

Get Price

Prediction of thin asphalt concrete overlay thickness and ...

2018-12-1  Thin asphalt concrete (AC) overlay thickness and density can be estimated accurately. Abstract The processing of ground-penetration radar (GPR) signals collected from thin asphalt concrete (AC) overlay is a challenging task due to the limitation of GPR signal resolution.

Get Price

FDTD Simulation for Moisture Asphalt Pavement Thickness ...

2021-5-22  Ground penetrating radar (GPR) has the potential to estimate the thickness and density of asphalt pavement during compaction. However, the surface moisture sprayed by the compactor interferes with the accuracy of data collection significantly. This study proposed an approach based on the extended common midpoint (XCMP) method to minimize the effect of surface moisture. Both the

Get Price

Continuous real-time monitoring of flexible pavement

2018-12-1  Continuous real-time monitoring of asphalt concrete layer thickness and density using ground penetrating radar is accurate. • The proposed truncation algorithm is valid when disguised second largest amplitude exists in the A-scan of GPR signal. • The BOMAG and VOEGELE material transfer vehicles perform the same based on layer thickness and ...

Get Price

Asphalt Film Thickness Debunked - Auburn University

2021-11-5  Asphalt film thickness is often mentioned in the literature on asphalt paving technology. A few highway agencies have used minimum asphalt film thickness as a mix design and quality assurance criteria. Although the concept of asphalt film thickness sort of makes sense, the reality is a different story.

Get Price

Asphalt Pavement Guide: Thickness EastCoat Pavement

2018-1-12  Asphalt Thickness: Asphalt driveways need to be a minimum of 2” thick and are typically 3” (compacted). The finish course of a parking lot, following the binder layer, should be a smaller and smoother stone at 1.5” thick for a total of 3”. For heavy duty

Get Price

FDTD Simulation for Moisture Asphalt Pavement Thickness ...

2021-5-22  Ground penetrating radar (GPR) has the potential to estimate the thickness and density of asphalt pavement during compaction. However, the surface moisture sprayed by the compactor interferes with the accuracy of data collection significantly. This study proposed an approach based on the extended common midpoint (XCMP) method to minimize the effect of surface moisture. Both the

Get Price

Real-Time Monitoring of Asphalt Concrete Pavement

2019-4-7  Accurate real-time density monitoring is crucial in quality control and quality assurance during the asphalt concrete (AC) pavement construction process. Ground penetrating radar (GPR) technology has shown great potential in the continuous real-time density prediction of AC pavement.

Get Price

Asphalt Film Thickness Debunked - Auburn University

2021-11-5  Asphalt film thickness is often mentioned in the literature on asphalt paving technology. A few highway agencies have used minimum asphalt film thickness as a mix design and quality assurance criteria. Although the concept of asphalt film thickness sort of makes sense, the reality is a different story.

Get Price

DEVELOPMENT OF GPR DATA ANALYSIS ALGORITHMS

the problem of thickness and density estimation for thin AC pavement overlay. 1.3 Objective The main objective of this research is to develop signal processing techniques that can increase the range resolution of GPR signals, allowing GPR to be used to predict the thickness and density of thin

Get Price

Estimating the Asphalt Binder Film Thickness Using ...

Asphalt binder film thickness has relation to mixing temperature and binder content in hot mix asphalt, which influences mixture’s performance. A significant variation in assessing the asphalt binder film thickness has been observed in the literature. Development of state of the art technology and Superpave specification requires the study of actual asphalt binder film thickness at micro-level.

Get Price

HOT MIX ASPHALT PAVEMENT DESIGN GUIDE

2021-5-13  The Maryland Asphalt Association recommends the use of these specifications. BASE DESIGNATIONS 19 MM Superpave Generally a minimum lift thickness of 3" is recommended. Aggregate sizes of the mix design should be checked prior to use in thinner lifts. 12.5 MM Superpave Generally a minimum lift thickness of 2" is recommended.

Get Price

AASHTO Pavement Thickness Design Guide

2019-6-30  Normally 50 years for concrete and 30 years for asphalt. b. Design Traffic (ESALs) – ESALs is the estimate of number of Equivalent 18 kip Single Axle Loads (ESALs) during the analysis period is required. This value can be estimated based on:

Get Price

STANDARD CONSTRUCTION SPECIFICATIONS FOR

2019-3-2  to make check tests of the asphalt received on the Project site, and if the asphalt is not in accordance with the certified analysis, he may reject the material. The asphalt required by these Specifications shall conform to the requirements of The Asphalt Institute for the type and grade shown below: Asphalt for Seal Coating CRS-2 or CRS-2P

Get Price

Guidance for Characterization of Existing Asphalt

2018-8-5  • The presence of moisture in an asphalt pavement is a concern for stripping when there are frequent heavy loads applied.. • Sum programs for thickness design use a drainage Coefficient (Cd) . This impacts the structural number (SN) of a flexible pavement based on

Get Price

Flexible pavement design.ppt - IIT Bombay

2015-10-26  The material should be tested for CBR at the dry density and moisture content expected in the field. ... Minimum Thickness of HMA over Emulsified Asphalt Bases Traffic Level HMA Thickness for Type-I Mix (in) HMA Thickness for Type-II III Mix (in) 10 4 1 2 10 5 1.5 2 10 6 2 3 10 7 2 4 >10 7 2 5.

Get Price

Real-Time Monitoring of Asphalt Concrete Pavement

Continuous density estimation by installing GPR on the roller is suggested to provide real-time compaction monitoring during the AC pavement construction process. AB - Accurate real-time density monitoring is crucial in quality control and quality assurance during the asphalt concrete (AC) pavement construction process.

Get Price

Pennsylvania’s Experience with Thin Asphalt Overlays

2020-1-30  of Asphalt Mix for Thin Lifts Asphalt Binder n PG 76-22 or PG 64E-22 if ESALs > 3M n PG 64-22 if ESALS ≤ 3M n PG 76-22 or PG 64E-22 if grade≥ 5% regardless of traffic level. Mix Design n 75 Gyrations n Air Void: 4.0% n VMA: 16.5%

Get Price

Estimating the Asphalt Binder Film Thickness Using ...

Asphalt binder film thickness has relation to mixing temperature and binder content in hot mix asphalt, which influences mixture’s performance. A significant variation in assessing the asphalt binder film thickness has been observed in the literature. Development of state of the art technology and Superpave specification requires the study of actual asphalt binder film thickness at micro-level.

Get Price

AASHTO Pavement Thickness Design Guide

2019-6-30  Normally 50 years for concrete and 30 years for asphalt. b. Design Traffic (ESALs) – ESALs is the estimate of number of Equivalent 18 kip Single Axle Loads (ESALs) during the analysis period is required. This value can be estimated based on:

Get Price

Improving Durability TSCS – Measuring Asphalt Density

2019-7-5  situ density of thin asphalt layers (such as TSCS) is unknown. Electromagnetic devices for HMA density measurements were made commercially available in the late 1990s. They are non-radioactive, light-weight, safe, easy to use and can provide rapid and reliable readings. Many studies on the electromagnetic devices have been published in the last 15

Get Price

Guidance for Characterization of Existing Asphalt

2018-8-5  • The presence of moisture in an asphalt pavement is a concern for stripping when there are frequent heavy loads applied.. • Sum programs for thickness design use a drainage Coefficient (Cd) . This impacts the structural number (SN) of a flexible pavement based on

Get Price

Flexible pavement design.ppt - IIT Bombay

2015-10-26  The material should be tested for CBR at the dry density and moisture content expected in the field. ... Minimum Thickness of HMA over Emulsified Asphalt Bases Traffic Level HMA Thickness for Type-I Mix (in) HMA Thickness for Type-II III Mix (in) 10 4 1 2 10 5 1.5 2 10 6 2 3 10 7 2 4 >10 7 2 5.

Get Price

Factors affecting asphalt compaction Asphalt magazine

In general, thick lifts of asphalt mix can be compacted more easily than thin lifts. The thicker the lift, the longer the heat is retained, and thus there is more time for the rolling to take place. As a general guideline, for finer dense graded mixes (those plotting above the 0.45-power chart maximum density line), the minimum lift thickness ...

Get Price

STANDARD CONSTRUCTION SPECIFICATIONS FOR

2019-3-2  to make check tests of the asphalt received on the Project site, and if the asphalt is not in accordance with the certified analysis, he may reject the material. The asphalt required by these Specifications shall conform to the requirements of The Asphalt Institute for the type and grade shown below: Asphalt for Seal Coating CRS-2 or CRS-2P

Get Price

Sixth Edition 2019 - New Jersey Asphalt Pavement

2019-3-15  type of asphalt binder which, in all but the most unusual circumstances, should be PG 64-22 or PG64E-22, and the compaction level, which should be determined based on traffic loading –typically Medium or Low . The next two parameters go hand in hand and should always be considered together. Aggregate size and lift thickness are inseparable.

Get Price
Copyright © 2021.Cina QC All rights reserved.Cina QC